Mange risk in a Facility

Mange risk in a Facility

Scenarios:

• Collapse of a ceiling, caused by heavy rainfall
• The failure of the HVAC system
• A major piece of plant/machinery failure within the facility

For each of the scenarios listed above, answer the three following questions:

• What controls are in place to manage the risk?
• What is the likelihood of the risk occurring?
• What are the consequences if the risk should occur?

• Develop and complete a risk matrix

• List the relevant parties and how you would communicate with and
seek input from them

• Develop a contingency plan for treatment of the risk

• Develop a risk register

• Develop a risk treatment schedule

• Include a method or strategy to monitor and review the assessment
PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

 

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.