Unit 2 Assignment 2: FC SAN Design

Scenario:

The IT infrastructure of an organization consists of three storage arrays direct-attached to a heterogeneous mix of 45 servers. All servers are dual-attached to the arrays for high availability. Because each storage array has 32 front-end ports, each could support a maximum of 16 servers. However, each existing storage array has the disk capacity to support a maximum of 32 servers. The organization plans to purchase 45 more servers to meet its growth requirements. If it continues using direct-attached storage, the organization needs to purchase additional storage arrays to connect these new servers. The organization realizes that its existing storage arrays are poorly utilized; therefore, it plans to implement FC SAN to overcome the scalability and utilization challenges. The organization uses high-performance applications; therefore, it wants to minimize the hop count for the servers access to storage.

Directions: Read parts 1 through 3 before you begin. When you have read the instructions, you may begin the assignment. In your submission, make sure to label each set of answers as Part 1 or Part 2 in your Word document that you submit. Part 3 will be contained in a Visio .vsd file.

Part 1:

Propose a switched fabric topology to address the organizations challenges and requirements. Justify your choice of the fabric topology. If 72-port switches are available for FC SAN implementation, determine the minimum number of switches required in the fabric. How many switches will be required?

Part 2:

Compute the Total number of server ports = (# of ports per server) x (# switches)
Compute the number of Array ports = (Array ports per array) x (# of arrays)
Compute the number of switches needed at the core (array level) = (total # array ports) / (# port per switch) (Having more ports available than needed is OK)
Compute the number of switches for servers required = (Total # of ports for servers) / (#ports per switch)
Make sure you have enough switch ports to create a mesh network. Every switch connected to every other switch.

Part 3:

Using Visio software program and draw a simple drawing to show your fabric design. It should include each switch as well as the fibre connections to each other. Make sure to clearly label and identify each component.

TAKE ADVANTAGE OF OUR PROMOTIONAL DISCOUNT DISPLAYED ON THE WEBSITE AND GET A DISCOUNT FOR YOUR PAPER NOW!

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.