1) dicuss the iterative, incremental and adaptive life cycle and when each type can be used providing an example of a project that could use each type.
2)using the attached paper format, do ur own search and invistugate different schedule delay analysis methods introduced in industry and research.
Schedule Delay Analysis Techniques In Industry 8. Research
Your Name
Abstract
Not more than 150 words.
Keyword
1. Introduction
2. Literature Review
3. Research Objective
4. Schedule Delay Analysis in Industry
5. Schedule Delay Analysis in Research
6. Conclusions
7. References
AbouRizk. S. (2010). “Role of Simulation in Construction Engineering and Management”
Journal of Construction Engineering and Management. Vol. 136. No. 10, 1140-1153.