FBI’s Trilogy and Sentinel Systems

FBI’s Trilogy and Sentinel Systems

Using the readings on the FBI’s Trilogy and Sentinel Systems as well as the readings on Veteran

Affairs’ VistA system which are all found on D2L’s Content  sections labeled Week 09 and Final Exam

Readings. Answer the following questions using double line spaced, 10-12 point font.   Any

additional readings used should be referenced.
LABEL EACH ANSWER BASED ON ITS NUMBER (1-5)).
FAILURE TO USE LABELS IS AN AUTOMATIC ZERO (0) SCORE.   Submit final on D2L Dropbox.
Ideal length is one to two pages per question with 6pages ideally.
In your own words:

1.    Describe in detail the most importantdifference in how the VistA system was developed

versus how the pre-Agile SENTINEL system was developed that you believe was responsible for

VistA’s success and pre-Agile SENTINEL’s near failure. In other words describe what was something

present in the VistA process that was absent in the pre-Agile SENTINEL system.

2.    Describe in detail the most importantsimilarity in how both the VistA system and the

successful SENTINEL system were developed. In other words describe something in the environment

of both successful implementations.

3.    Was there anything really important that you feel was lacking in the way the pre-Agile

Sentinel system was developed?  Describe what that was and why it was important in detail.

4.    Describe in detail at least 2 important aspects of the Agile method that you feel were

responsible for the success on the FBI Sentinel System labeling them 4a, 4b..4n.

Hint:  “Describe” is more than just list.  Remember to look at how program management concepts

and PMO concepts as well as Agile concepts were or were not at work in the VistA and SENTINEL

cases.

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.