1- why there should or should not be container deposit legislation

this topics:

1- why there should or should not be container deposit legislation

2- waste disposal costs are too cheap in Australia

3- The current legislation in Australia for managing waste is effective- discuss.

4-we should recover energy from waste rather than dispose of to landfill

5- companies should be required to complete a life cycle analysis before being able to sell new products

6- sending materials overseas for recycling is not ethical

221 Burwood Highway

Burwood VIC 3125

Please contact Trevor Thornton via phone or email in the first instance if you have any

questions

Aim and

Objectives:

Social, economic and not least environmental pressures are requiring that all waste producers aim to

manage their wastes so that both

the impact on the environment and the cost of disposal are

minimised.

To achieve these dual aims, waste management involves examining why wastes are

produced and taking all reasonable steps to minimise the production of wastes.

If wastes have to be

produ

ced, recycling or reuse options must be explored.

The preferred approach to the production of wastes such as waste avoidance, reduction, reuse and

recycling as well as the philosophy of cleaner production will be discussed in detail together with

conside

rations of on

site or off

site treatment. Techniques of minimising waste by conducting audits and

evaluating alternatives based on economic, technical and social aspects will be covered in greater

detail. This will be linked to the development and implemen

tation of waste management plans. The

various disposal techniques available for a range of hazardous materials will be discussed, for example

burial, incineration, co

generation, pre

treatment, storage and immobilisation. In addition, the issues

relating t

o the collection, transport and disposal of municipal wastes will be examined in the context of

their contribution to the overall waste problem in Australia. Various alternatives for reducing and

disposing of this waste stream will be examined.

The focus

of this course is to enable students to develop the appropriate approach to waste

management in general, rather than to focus on specific waste types or waste streams.

There is

potential for students to pursue individual interest via the case study and e

ssay.

Topics to be addressed in this unit include:

?

Regulatory controls on waste management

?

Techniques for conducting waste audits

?

Use of life cycle analysis as a decision making tool

?

Waste minimisation, reuse and recycling techniques

?

Cleaner production

techniques

?

Waste management technologies

?

Municipal waste management

?

Development of waste management strategies

?

Implementation of waste management systems

SLE320 Sustainability and Waste

Management

Page |

3

Course Rules

In order to ensure that there are no misunderstandings

about what is expected in S

LE320

the

following items should be noted now:

1

.

Reading of references will greatly enhance your understanding of the unit.

2

.

All assessable work must be handed in by the due date.

Submission dates will only be extended

under exceptional circumstances.

As

signments should

be placed into “Dropbox” on

CloudDeakin

or

emailed to me

.

ALL LATE WORK WILL BE PENALISED

Marks will be deducted for late work at the rate of one mark per working day until the mark

is

zero

.

No late work will be accepted after work has b

een marked and returned to other

students.

All work handed in for assessment must be the student’s own work, except where acknowledged by the

insertion of a reference. Passing off the work and/or ideas of others as your own is plagiarism, and

instances of

this, or any other forms of copying or cheating, will be dealt with severely. See Faculty of

Science

, Engineering and Built Environment

policy on plagiarism.

Assignments

The final grade for the unit will be based on:

0

49%

Fail (N)

50

59

%

Pass

(P)

60

69%

Credit (C)

70

79%

Distinction (D)

> 80%

High Distinction (HD)

All work submitted will be graded according to the system above. The final grade for the unit will be the

sum of the individual marks for each piece of work.

Submission date

s will only be extended under exceptional circumstances. If an extension is required

you must complete and assignment extension request form which you must then discuss with your

lecturer. If approval is granted, the lecturer will sign the form that must t

hen be kept by the student. The

student must then submit the assignment with the assignment extension form as the covering sheet

.

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂   

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.