Dandeo Door Corporation Case Study

Dandeo Door Corporation Case Study
The Dandeo Door Corporation (DDC) manufactures steel and aluminum exterior doors for commercial and residential applications. DDC landed a major contract as supplier to  Berney Homes, a builder of residential communities in several major cities throughout the southwestern United States. Because of the large volume of demand, DDC expanded its manufacturing operations to three shifts and hired additional workers.
Not long after DDC began shipping windows to Berney homes, it received some complaints about excessive gaps between the door and frame. This was somewhat alarming to DDC, because its reputation as a high quality manufacturer was the principle reason that it was selected as a supplier to Berney homes. DDC placed a great deal of confidence in its manufacturing  capability because  of its well trained and dedicated employees, and it never felt the need to consider formal process control approaches. In view of the recent complaint, however, Jeremy Dandeo, The company president, suspected that the expansion to a three-shift operation, the pressures to produce higher volumes, and the push to meet just in time delivery requests were causing a breakdown in quality.
On the recommendation of the plant manager, Jeremy hired a quality consultant to train the shift supervisors and selected line workers in statisticalprocess control methods. As a trial project, the plant manager wants to evaluate the capability of critical cutting operation that he suspects might be the source of the gap problem. The target specification for this cutting operation is 30.000 inches with a tolerance of 0.125inch. Thus, the upper and lower specifications are LSL= 29.875 inches and USL= 30.125 inches. The consultant suggested inspecting five consecutive door panels in the middle of each shift over a 10 day period and recording the dimension of the cut. Exhibit 16.12 shows 10 days’ data collected for each shift, by operator.
Case Questions:
1)    Interpret the data in the attached Excel Document, establish a state of statistical control, and evaluate the capability of the process to meet specifications. In other words, produce the appropriate control chart and interpret the results.
2)    What do the initial control charts tell you? Do any out of control conditions exist?
3)    If the process is not in control, what might be the likely causes, based on the information that is available?
4)    What is the process capability? What do the process capability indexes tell the company?
5)    Is DDC facing a serious problem that it needs to address? How might the company eliminate the problems found by Berney Homes?
Shift    Operator    Sample    Observation
Sample    1    2    3    4    5
1    Jermey    1    30.046    29.978    30.026    29.986    29.961
2    Dominic    2    29.972    29.966    29.964    29.942    30.025
3    Cobalt    3    30.046    30.004    30.028    29.986    20.027
1    Jermey    4    29.997    29.997    29.980    30.000    20.034
2    Dominic    5    30.018    29.922    29.992    30.008    30.053
3    Cobalt    6    29.973    29.990    29.985    29.991    30.004
1    Jermey    7    29.989    29.952    29.941    30.012    29.984
2    Dominic    8    29.969    30.000    29.968    29.976    29.973
3    Randy    9    29.852    29.978    29.964    29.896    29.876
1    Jermey    10    30.042    29.976    30.021    29.996    30.042
2    Dominic    11    30.028    29.999    30.022    29.942    29.998
3    Cobalt    12    29.955    29.984    29.977    30.008    30.033
1    Jermey    13    30.040    29.965    30.001    29.975    39.970
2    Dominic    14    30.007    30.024    29.987    29.951    29.994
3    Cobalt    15    29.979    30.007    30.000    30.042    30.000
1    Jermey    16    30.073    29.998    30.027    29.986    30.011
2    Dominic    17    29.995    29.966    29.996    30.039    29.976
3    Cobalt    18    29.994    29.982    29.998    30.040    30.017
1    Jermey    19    29.977    30.013    30.042    30.001    29.962
2    Dominic    20    30.021    30.048    30.037    29.985    30.005
3    Randy    21    29.879    29.882    29.990    29.971    29.953
1    Jermey    22    30.043    20.021    29.963    29.993    20.006
2    Dominic    23    30.065    30.012    30.021    30.024    30.037
3    Randy    24    29.899    29.875    29.980    29.878    29.877
1    Jermey    25    30.029    30.011    30.017    30.000    30.000
2    Dominic    26    30.046    30.006    30.039    29.991    29.970
3    Cobalt    27    29.993    29.991    29.984    30.022    30.010
1    Jermey    28    30.057    30.032    29.979    20.027    30.033
2    Dominic    29    30.004    20.049    29.980    30.000    29.986
3    Cobalt    30    29.995    30.000    29.922    29.984    29.968