essay

essay
1.    You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required).

2. Electro Fans has just received an order for one thousand 50-cm fans due week 7. Each fan consists of a housing assembly, two grills, a fan assembly, and an electrical unit. The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a motor, a switch, and a knob. The accompanying table gives lead times, on-hand inventory, and scheduled receipts.
a) Construct a product structure.
b) Construct a time-phased product structure.
c) Prepare a net material requirements plan.

3.    a) Given the product structure and master production schedule, develop a gross requirements plan for all items.

b) Given the preceding product structure, master production schedule, and inventory status, develop a net materials requirements (planned order release) for all items.

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.