management calcuations

management calcuations
Project instructions:
please read the paper the paper attached and answer the following:

1. For the high level value stream map in figure 1, calculate the following
a) Flow time
b) Value added time
c) Waste
d) Percent value added time , given that % value added time =
Value added time / Flow time

. Describe, in short, how OR process was improved and how this improvement affected the process metrics (flow time, value added time, waste and % value added time)

 PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.