secret project managment
Guidelines for the Project Reports
Due Date: Projects are due at the 14th week of the semester.
Length and Format: Project must be typed, font 11-12, 1.5 space and one inch margins in the four
sides. It can be of 9-15 pages long excluding appendices that can be used for illustrations (pictures,
tables, …)..
Cover Page: It consists of the information below and in that order:
* Name of the College
* Number and title of the course
* Name of professor
* Semester and year
* Title of the project
* Name/s of the team members
The Report: It consists of:
1. Executive Summary or Abstract: This is a summary that informs the reader in about several lines
what is in the report. It briefly shows what is the problem/application, its significance, what was
done about it, and the conclusion. This should not be more than half a page.
2. Introduction: This is an expansion form of the abstract. It shows the background and
environment of the problem/application; how the project came about and how important it is to
that environment/firm; what is to be done to deal with it (managerial methods to be used, data
gathered, references used, etc., ….); and then outline the remainder of the report. In this section
references are cited where they are required. This section should not be more than 2-3 pages.
3. Modeling, Data gathering, and Analysis: This section depends on the nature of the
application/problem. It may consist of one section or few subsections. In all cases, it is the section
where the real research/meat is. In this section it shows how you solved or dealt with the problem.
Again, references need to be cited where they are required. No opinion/conclusion/judgment is to
be stated without referencing or proving it. This can be of length 4-6 pages.
4. Conclusions or Recommendations: This section provides the conclusions or recommendations of
the project based on the analysis of Section 3. These depend on the nature of the project. They can
be a set of recommendations to be adopted by the firm as they provide an improvement over what
is currently used, the proven value for the firm by using what is in Section 3 to solve the problem,
etc.. This can be between 1-2 pages.
5. References: The project must have no less than six reliable and of high quality references. If the
references include an official in a firm, then his/her contact information must be provided.
Confidentiality can be easily covered by referring to individuals as A, B, C, ….
content
1.explain what is a secret project like a war secret activity, secret bulding managment,opening
new secret project,…….
2.why it is secret.what is the diffrent between normal project managment and secret project
managment?(ther is a hole project is secret and some project have a part of it is secret)example
3.stage of project managment(4).method or procedures to manage a secret project.example
4.ther are organization structure and work structure
5.the plan and scheduale of( ..1.human resourse and2. natural resourse with example) when you can
do a secret project and wher and how ,the people who you trust and the way..secret finance for
some peaple (activity)with some example..
6.after the plan we work.review.and take the data that we have.
7. quality assurancse.see if we are in the coorect way.how much we delata and how much more
cost.is it secret until now?is it the same goale that we need when we start?recovery period
8.difficulties in managment a secret project and important of that on the project cost.(in cost-
work-plan)with example(risk managment)
9.if the secret project available what we will do? …..contentengency plan with example
10.illustrate the above thruoh a case of a secretproject that was done before likethat of tesco on
lossangeles.3example each has 2 paper
PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

+1 862 207 3288 