Project Scope and Work Breakdown Structure

Project Scope and Work Breakdown Structure
Paper instructions:
Final Project: Project Scope Statement and Work Breakdown Structure
During Week 3, you developed a project charter for the St. Dismas Assisted Living Facility case study. This week, you will develop a Scope Statement and Work Breakdown Structure (WBS) for this project. Pages 123 and 124 of the PMBOK describe the project scope statement. The scope statement includes the product (or service) description, the acceptance criteria, project deliverables, project exclusions, constraints on the project and assumptions.

The Work Breakdown Structure helps break the project down into manageable parts in a process called decomposition. The number of levels in the WBS is related to the project profile. After developing the scope statement for the project, read pages 87–98 of the Mantel text and pages 128–132 of the PMBOK and develop a hierarchical WBS for the project.

In your paper, include the standard title page, introduction, scope statement, WBS, and conclusions. Your project scope statement must be at least 2–3 paragraphs, double-spaced. Your WBS must include at least 10–15 deliverables and three levels.

Support your assignment with specific references to all resources used in its preparation. Use correct

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.