Management

Linear programming

Project description
FOLLOW THE INSTRUCTIONS TO DO THE ASSIGNMENT :
1-Graph shl be 1 entire sheet of paper spread the graph out so you can see what happens to the lines.
2-Plot numbers on X and Y axis starting with zero and make graph scale according to your particular numbers.
3- Color code and label each line and use different direction of shading for each line (horizon, vertical, slantd)
4- All points within quadrant must be solved for and show work for all points one point must be solved using matrix reduction.
5- Need table of corner points.
6- Write explanation paragraph 5-8 sentences. pick 1 solution and support and validate your answer. What do you suggest we do? and why?

Here is the Linear programing:
An oil company owns and operates two refineries. Each day Refinery A produces 200 barrels of high-grade oil, 400 barrels of medium-grade oil, and 600 barrels of low-grade oil at a cost of $20,000. Each day Refinery B produces 300 barrels of high-grade oil, 150 barrels of medium-grade oil, and 420 barrels of low-grade oil at a cost of $14,500. An order has been received for 2000 barrels of high-grade oil, 1750 barrels of medium-grade oil, and 4200 barrels of low-grade oil. How many days should each refinery be operated to minimize the cost of filling the order? What is the minimum cost?

TAKE ADVANTAGE OF OUR PROMOTIONAL DISCOUNT DISPLAYED ON THE WEBSITE AND GET A DISCOUNT FOR YOUR PAPER NOW!

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.