risk and value management

Scenario

Your client is developing a high end hotel, of 4 or 5 star quality, providing 400 bedrooms. The City centre site (Dubai) has been

identified and purchased and the client has selected RIBA PoW 2013 framework to manage and deliver the project.

The client is seeking innovative scheme proposals to become market leader in exploiting the growing business and leisure market

opportunities that a high-end hotel will service. Your VRM consultancy has been hired to provide value, cost and risk services to the

client and design team at the stages of RIBA PoW 2013 identified below. The purpose of hiring your consultancy services is to ensure the

existing design team develop innovative and cost efficient scheme proposals befitting a high profile and prestigious development that can

be delivered on time and to budget.
Individual coursework submission:
VALUE

RIBA PoW Stage 0 – Strategic project overview (20%)

Prepare a report for the design team explaining the relative importance to the client of each of the six categories of value identified in

the CABE value driver categorisation, and suggest how these might influence the design. This will help ensure the design team understand

the client’s values as they develop the design solution.“ It’s Attached as CABE VALUE DRIVERS”

RIBA PoW Stage 1 – The project budget (15%)

Advise the client on how much they should budget for the hotel development (exclude external works) based on cost models (BCIS)“you will

choose a file (breackdown example) and the BCIS not in the information it is attached in the reference file, you will choose a random

breakdown structure and compare it to our hotel and do similar one. of hotel projects and propose an outline cost plan for the project.

Then also find and compare 4 hotels in Dubai city which also have the same budget as our hotel (Ex: Sheraton, Hilton, Rotana), its about

(5000 – 6000 DHS/sqm). The BCIS example attached is in Euro Currency You must change it to (DHS/AED) UAE Currency.

So ,You must do similar to the BCIS example but for our Hotel.
RIBA PoW Stage 3 – Developing the design (25%)

It is nine months on from Stage 0 and the client is facing some financial difficulties. They are demanding a 10% cut in the budget.
It is nine months on from Stage 0 and the client is facing some financial difficulties. They are demanding a 10% cut in the budget from

the design team. Prepare a report on how this can be achieved by proposing elements of your cost plan to be targeted for a VE study and

explaining why they have greatest potential for achieving the saving whilst minimising impact on the quality and integrity of the

development. You are encouraged to make radical value engineering proposals which go beyond traditional cost cutting. “ So you will cut

10% from the SAME BCIS you did in Stage 1 – The project budget” , You will use the file “HotelCostModel” attached. You can also use other

HW University Library Journals.
RISK

RIBA PoW Stage 0 – Strategic risk assessment (25%)

The site has been identified, the project team assembled and the project is now nearing the end of Stage 0. However, before the client

commits to proceeding with the project they want to carry out a strategic risk assessment on which they will base their go/no-go decision.

Prepare a report on the major internal and external strategic risks facing the client from the project, and outline recommendations for

dealing with these. Conclude your report by recommending whether or not the client should commit their investment to the project and

proceed.
Your Reference will be from HERIOT WATT UNIVERSITY libraryBooks OR Journals“http://www.hw.ac.uk/is/find-resources.htm
OR http://www.hw.ac.uk/is/resources/journals.htm”.

RIBA PoW Stage 5 – Risk control and construction (15%)
Assume the project has proceeded to this stage.

Prepare a risk register of the top 5 risks facing the project team and contractor. This should outline the associated control measures

that will deal with these risks.
Indicative word count : 4500-5000 words

Library

http://www.hw.ac.uk/is/find-resources.htm
Or
http://www.hw.ac.uk/is/resources/journals.htm
How to inter BCIS

The following is the Website of the BCIS :

http://service.bcis.co.uk.ezproxy1.hw.ac.uk/BCISOnline/

1- First inter the username and password
a. Username: sts1
b. Password: yjJG5N1L5g
c. Log in
2- Inter username and password for the BCIS
a. Username:E0275
b. Password:yj893c
c. Log in
3- After log in click on Analysis
4- Then click on ( 800 Residential facilities)
a. Select (hotels) then (close and apply)
5- Then click on (next) (next) (next) three times
a. Then choose randomly from the results

© 2020 customphdthesis.com. All Rights Reserved. | Disclaimer: for assistance purposes only. These custom papers should be used with proper reference.